| Title |  | Exhibitor |  | Date Submitted |
 |
 |
 |
| AKER Well Service |  | Spartan Solutions Limited |  | 11 Aug 2011 |
| Swire Oilfield Services |  | Spartan Solutions Limited |  | 11 Aug 2011 |
| Advantages of Stellar Pancake Load Cells |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Advantages of STI Hammer Union |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Coiled Tubing Injector Head Load Cell |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Dual Output Pressure & Temperature Sensors |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Oil & Gas Hazardous Location Sensors |  | Stellar Technology, Inc. |  | 21 Jul 2011 |
| Polished Rod Load Cell |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Sensors for Subsea Oil and Gas Tieback |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Subsea Load Cell |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Subsea Wellhead Sensor |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| Upstream Oilfield Sensors |  | Stellar Technology, Inc. |  | 28 Jul 2011 |
| SHEAR ALL RAM |  | T3 Energy Services Inc |  | 01 Sep 2011 |
| THE POWER OF ONE |  | T3 Energy Services Inc |  | 01 Sep 2011 |
| Neste Diesel |  | Tekla |  | 28 Jul 2011 |
| Saipem offshore |  | Tekla |  | 28 Jul 2011 |
| Structures that power |  | Tekla |  | 28 Jul 2011 |
| Multi Purpose Handling System |  | Tekmar Subsea |  | 23 Aug 2011 |
| Oil Pipe Repaired |  | Tekmar Subsea |  | 23 Aug 2011 |
| Tekmar Pipeline Repair Solutions |  | Tekmar Subsea |  | 07 Jun 2011 |
| Tentec Shows Engineering Expertise on Riser System |  | Tentec Limited |  | 08 Aug 2011 |
| Redheugh Bridge, Newcastle |  | Total Access Ltd |  | 27 Jul 2011 |
| Gas Ejector Boosts Performance of Mechanical Compressor |  | Transvac Systems Ltd |  | 09 Jun 2011 |
| Gas Ejector restarts dead Well |  | Transvac Systems Ltd |  | 09 Jun 2011 |
| Integrated Surveying in the UK |  | Trimble Navigation |  | 19 Jun 2011 |
| Monitoring a Pipeline |  | Trimble Navigation |  | 19 Jun 2011 |
| Scanning Mission on the High Seas |  | Trimble Navigation |  | 19 Jun 2011 |
| Trimble 3D Scanning Saves Cost on New Oil Vessel |  | Trimble Navigation |  | 19 Jun 2011 |
| Baleia Azul |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| Cidade de Sao Paulo |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| Clov FPSO |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| FPSO Espirito Santo |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| FPSO Gimboa |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| FPSO Pazflor |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| P56 |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| P57 |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| P63 |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| PSVM FPSO |  | Veolia Water Solutions & Technologies |  | 06 Jul 2011 |
| 36" above ground pipeline repair |  | Walker Technical |  | 16 May 2011 |
| Clamp and pipework encapsulation |  | Walker Technical |  | 16 May 2011 |
| Closed drain line repair - above splashzone |  | Walker Technical |  | 16 May 2011 |
| Composite repair - alternative to replacement |  | Walker Technical |  | 16 May 2011 |
| Encapsulation of valves and flanges |  | Walker Technical |  | 16 May 2011 |
| Glycol tank repair |  | Walker Technical |  | 16 May 2011 |
| Overwraps and extended life of repairs |  | Walker Technical |  | 16 May 2011 |
| Repairs underneath the helideck |  | Walker Technical |  | 16 May 2011 |
| Structural ring strengthening |  | Walker Technical |  | 16 May 2011 |
| Structural strengthening of walkway supports |  | Walker Technical |  | 16 May 2011 |
| WEG MOTORS, GENERATORS & PANELS PROVIDE POWER & CONTROL ON PETROBRAS P-53, ONE OF WORLD’S LARGEST FLOATING OIL PLATFORMS. |  | WEG Electric Motors |  | 05 Jul 2011 |
| BOOSTING THE PERFORMANCE AT VARG |  | Welltec |  | 19 Aug 2011 |
| RIG-LESS REMOVAL OF PERMANENT BRIDGE PLUG |  | Welltec |  | 19 Aug 2011 |
| RIGLESS INTERVENTION IN THE GULF OF MEXICO |  | Welltec |  | 19 Aug 2011 |
| RISERLESS SUBSEA SCALE MILLING IN THREE HOURS |  | Welltec |  | 19 Aug 2011 |
| RLWI, MILLING AND RETRIEVING HARD DEBRIS |  | Welltec |  | 19 Aug 2011 |